Healthcare Case Study Landing Page

Massachusetts General Hospital Air Handling

CHALLENGE: When Partners HealthCare was faced with the possibility of having to tear down its entire facility, the organization looked to Air Enterprises for alternative options in air handling.

For many healthcare facilities, air handling unit installation can cause problematic downtime due to construction in high traffic areas. Air Enterprises developed two design strategies for Partner’s Healthcare, each considering the limited access and criticality of the location for potential equipment rigging.
Read More


Hartford Hospital Emergency Room Air Handling

Hartford Hospital Case Study

CHALLENGE: Air handling units at the Hartford Hospital Emergency Room served critical spaces in the facility, and they could not be down for more than a few hours. The challenge for Air Enterprises was to move more air for the hospital within the same footprint by improving ventilation, while also reducing facility downtime as much as possible.
Read More