Research

Genzyme Biotech Research Laboratory

Two Air Enterprises’ AHUs and four  Energy Recovery Wheels installed in Genzyme Biotech Research Laboratory, Boston

CHALLENGE: Genzyme’s eight-story bio-chemical research laboratory was operating with outdated air handling equipment. Mechanical rooms on eight hospital floors needed air handling unit upgrades. There was an urgent need to improve ventilation, meet current codes and save on air handling costs for research labs.
Read More


Sanford Burnham

Burnham_main1

 

CHALLENGE: Sanford Burnham had significant design considerations when selecting an air handling system for its research lab space. The lab had very little access for the equipment to be installed, and the air handling unit had to fit in with the existing boiler room.
Read More